1. Other
  2. Home Remodel & Repair

2018 Bathroom Remodel

Metro Bath & Tile's Renovation of our master and hall baths starting on 2018-02-13.
Read More
2018-02-26 (Day 10): Hall Bath
111 / 270

2018-02-26 (Day 10): Hall Bath

Bath

  • 2018-02-23 (Day 9): Master bath.  Shower completed, toilet installed, temporary vanity/sink installed.
  • 2018-02-23 (Day 9): Master bath.  Towel rack.
  • 2018-02-23 (Day 9): Master bath.  Temporary vanity & sink (from hall bath).
  • 2018-02-23 (Day 9): Hall bath.  Electric outlet to be replaced.  Box too deep (extends beyond joist) and wires too short after moving.
  • 2018-02-23 (Day 9): Hall bath.  Vanity, toilet, and flooring removed.
  • 2018-02-23 (Day 9): Hall bath.  Vanity, toilet, and flooring removed.
  • 2018-02-23 (Day 9): Hall bath.  There is a pipe inside the HVAC return.  That's why it is so deep.
  • Untitled photo
  • 2018-02-26 (Day 10): Hall bath.  Labels on the side of the tub.
  • 2018-02-26 (Day 10): Hall Bath
  • 2018-02-26 (Day 10): Hall Bath
  • 2018-02-26 (Day 10): Hall Bath
  • 2018-02-26 (Day 10): Hall Bath
  • 2018-02-26 (Day 10): Hall Bath
  • 2018-02-26 (Day 10): Hall Bath
  • 2018-02-26 (Day 10): Hall Bath
  • Untitled photo
  • 2018-02-27 (Day 11): Hall Bath
  • 2018-02-27 (Day 11): Hall Bath
  • 2018-02-27 (Day 11): Hall Bath
  • No Comments
  • Photo Sharing
  • About SmugMug
  • Browse Photos
  • Prints & Gifts
  • Terms
  • Privacy
  • Contact
  • Owner Log In
© 2023 SmugMug, Inc.