1. Other
  2. Home Remodel & Repair

2018 Bathroom Remodel

Metro Bath & Tile's Renovation of our master and hall baths starting on 2018-02-13.
Read More
Untitled photo
214 / 270

Day19a

  • 2018-03-09 Master Bath.  Baseboard tile fixed.
  • 2018-03-09 Master Bath.  Baseboard tile fixed.
  • Untitled photo
  • 2018-03-10 Main Floor Half-Bath.  Ceiling stain.
  • 2018-03-10 Main Floor Half-Bath.  Ceiling stain.
  • 2018-03-10 Main Floor Hallway.  Ceiling stain.
  • 2018-03-10 Main Floor Hallway.  Ceiling stain.
  • 2018-03-10 Main Floor Half-Bath.  Wood floor damage.
  • 2018-03-10 Main Floor Half-Bath.  Wood floor damage.
  • 2018-03-10 Main Floor Half-Bath.  Wood floor damage.
  • 2018-03-10 Main Floor Half-Bath.  Wood floor damage.
  • 2018-03-10 Main Floor Half-Bath.  Wood floor damage.
  • 2018-03-10 Main Floor Half-Bath.  Wood floor damage.
  • Untitled photo
  • 2018-03-12 Master Bath.  Removing the vanity to access the tub leak.
  • 2018-03-12 Master Bath.  Cutting the drywall to access the tub plumbing.
  • 2018-03-12 Master Bath.  Tub plumbing exposed.
  • 2018-03-12 Master Bath.  Tub plumbing exposed.
  • 2018-03-12 Master Bath.  Tub plumbing exposed.
  • 2018-03-12 Master Bath.  The overflow drain that was the source of the leak.
  • No Comments
  • Photo Sharing
  • About SmugMug
  • Browse Photos
  • Prints & Gifts
  • Terms
  • Privacy
  • Contact
  • Owner Log In
© 2023 SmugMug, Inc.