2018 Bathroom Remodel

Metro Bath & Tile's Renovation of our master and hall baths starting on 2018-02-13.
Read More
2018-02-19 (Day 5): Master bath. Shower tile floor installed.
63 / 270

2018-02-19 (Day 5): Master bath. Shower tile floor installed.

MasterBath

  • 2018-02-19 (Day 5): Master bath. Shower tile floor installed.
  • 2018-02-19 (Day 5): Master bath. Shower tile floor installed.
  • 2018-02-19 (Day 5): Master bath. Shower tile floor installed.
  • 2018-02-19 (Day 5): Master bath. Shower tile floor installed.
  • Untitled photo
  • 2018-02-20 (Day 6): Master bath. Shower wall tiles installed.
  • 2018-02-20 (Day 6): Master bath. Shower wall tiles installed.
  • 2018-02-20 (Day 6): Master bath. Shower wall tiles installed.
  • 2018-02-20 (Day 6): Master bath. Shower wall tiles installed.  Glass shelves mounted.
  • 2018-02-20 (Day 6): Master bath. Shower wall tiles installed.  Faucet control hole.
  • 2018-02-20 (Day 6): Master bath. Shower wall tiles installed.  Faucet hole.
  • 2018-02-20 (Day 6): Master bath. Shower wall tiles installed. Faucet control hole.
  • Untitled photo
  • 2018-02-21 (Day 7): Master bath.  Floor almost finished.
  • 2018-02-21 (Day 7): Master bath. Threshold installed.
  • 2018-02-21 (Day 7): Master bath.  Floor almost finished.
  • 2018-02-21 (Day 7): Master bath.  Shower seat support.
  • 2018-02-21 (Day 7): Master bath.  Shelves and shower controls installed.
  • 2018-02-21 (Day 7): Master bath.  Shower being grouted.
  • 2018-02-21 (Day 7): Master bath.  Shower being grouted.